Monday, December 7, 2009

The Plan

So, I might have mentioned that our new house (that we get in 5 days!) requires quite a bit of work. Hubs and I have made a list of the things that need to/we want to/should get done. It's quite extensive and will keep us and our bank accounts quite busy:

  • Replace the washer & dryer (although we've already purchased these-yay)
  • Carpet: Remove and install new on 3rd level and all stairs
  • Hardwood: Install on main level & split level
  • PAINT!
  • Entrance & Garage Entry ceramic tiles
  • Replace backyard sliding door
  • Replace all windows (yep)
  • Replace kitchen appliances
  • Replace powder room countertop
  • Gut & Reno ensuite (it's all blue fixtures, sweet huh?)
  • Replace front entrance closet doors
  • paint or replace the powder room door
  • Remove or replace front screen door
  • Paint or replace front door
  • Replace garage entry door
  • Re-do & expand driveway
  • Open up main level by removing 2 walls and installing a kitchen island there
  • Replace ancient, fugly lighting fixtures
  • Replace banister & spindles
  • Change electrical panel
  • Plus: chimney fixes (thanks inspector)
  • Plus: 3 foundation crack repairs (thanks inspector)

Phew---looks tiring, huh? Hope hubs' is as up for it as he says he is!